The East-West Expressway in Algeria is 1216 kilometers long with six lanes in both directions and is the main traffic artery running through the east-west direction of Algeria.
Main work undertaken
JSTI conducted testing technical consulting, data control, and inspection and measurement for the entire engineering project by establishing and operating the central laboratory of the general contractor, improving the overall quality control level.
Achievements
Won the 15th China Civil Engineering Zhan Tianyou Award.